WEEKLY REPORT · ISO 2026-W36

PHARE, 31 Aug – 6 Sep 2026

Commits on master
0 same vs last week
PRs merged
0 same vs last week
Issues opened
0 same vs last week
Issues closed
0 same vs last week
Reviews
4 ▼ -9 vs last week
CI builds
165 ▲ +164 vs last week
TeamCity history incomplete this week

The week at a glance

each dot is one event · hover for details, click to open
Mon 31MTue 1TWed 2WThu 3TFri 4FSat 5SSun 6S
Commits on master
0 PRs merged
0 PRs opened
2 Issues opened
0 Issues closed
0 Reviews
4 CI failures
44
Daily numbers as a table
DayCommitsIssues openedIssues closedPRs openedPRs mergedPRs closedReviewsCommentsCI buildsCI failed
Mon 31 Aug000201013925
Tue 1 Sep0000000284
Wed 2 Sep0000000033
Thu 3 Sep00000012547
Fri 4 Sep00000128535
Sat 5 Sep0000001260
Sun 6 Sep0000000020

Issues

0 opened · 0 closed

Open issues

The axis starts at 110 so the weekly changes stay visible.

Labels on new issues

No issue opened this week.

How closed issues were closed

No issue closed this week.

Pull requests

0 merged · 2 opened · 2 closed unmerged

Open PRs

The axis starts at 40 so the weekly changes stay visible.

Every PR that moved this week

mergedopen draft or closed first human review
Time open (log scale)
1 h1 d1 wk1 mo1 yr
Lines changed, by area (log scale)
101001k10k
1319 Feature/mhd edge native dissipative flux (reduce ghost number constraint).@UCaromel
1318 Minimal boundary conditions@igirault
1238 tagging: generic field selection, lohner + wavelet (MR) criteria@igirault
1236 Field boundary conditions @igirault
coreamrpythontestssimulator/iobuild/ci

People

human activity inside the week · darker = more

Who did what

CommitsPRs openedPRs mergedReviews givenIssues openedIssues closedCommentsLines on master
@PhilipDeegan ···4··11 ·
@igirault ·1····4 ·
@UCaromel ·1····· ·

Bots: coderabbitai (5 reviews, 2 comments), github-advanced-security (5 reviews, 0 comments).

Who reviewed whom

reviewer ↓ · author →igiraultUCaromel
PhilipDeegan31
Median first review3.9 d
Median time to merge–

CI and tests

58,323 test executions on TeamCity · 0 failed · 0 ignored

TeamCity only keeps about 200 builds per configuration, so this week is incomplete for gh_pr_gcc (history starts 2026-08-31), gh_pr_clang (history starts 2026-09-03), gh_pr_clang_samraisub (history starts 2026-08-31), gh_pr_gcc_samraisub (history starts 2026-09-01).

passedfailedcanceledone tick per build, placed at its finish time
Mon 31MTue 1TWed 2WThu 3TFri 4FSat 5SSun 6S
GitHub Actions CodeQL
14 ✓ · 2 ✗ · 9 canceled CMake Ubuntu
15 ✓ · 0 ✗ · 9 canceled TeamCity gh_pr_clang
11 ✓ · 11 ✗ · 9 canceled · 32,052 tests run gh_pr_gcc_samraisub
12 ✓ · 14 ✗ · 1 canceled gh_pr_gcc
16 ✓ · 8 ✗ · 1 canceled · 26,271 tests run gh_pr_clang_samraisub
15 ✓ · 7 ✗ · 0 canceled Build Docker-dep images
0 ✓ · 2 ✗ · 0 canceled Build Docker images
1 ✓ · 0 ✗ · 0 canceled build_samrai_upstream_dep
1 ✓ · 0 ✗ · 0 canceled TeamCity, personal builds Ivan · build
0 ✓ · 0 ✗ · 7 canceled

Red, then green on the same commit

8 reruns turned a red build green with no failing test: a build or infrastructure problem, not a test.

Code on master

0 commits · lines removed ← → lines added

Where the code changed

No commit on master this week.

Commits

No commit on master this week.